Friday night we saw the majority of the heating and air ducts in. During Saturday's visit we saw our front and back sliding glass door had been installed, the HVAC close to being finished, and plumbing almost done as well! These two walk throughs were our first visits into the house as well! It was really neat to see the rooms roughed out and I can really see it coming along. Here are some pictures of the inside and outside as of Saturday.
7/30/10
7/31/10 door in and porch started
Study
dining room
family room
HVAC
basement window
upstairs bathtub
Bedroom 4-guest bedroom
Bedroom 1 -Natalie's bedroom
Loft
Bedroom 2
Join us as we embark on our house building journey. Beginning with selling our old home to moving to an apartment to the building process and then finally decorating the new house. It should a fun adventure!
Saturday, July 31, 2010
Thursday, July 29, 2010
Shingles, windows, HVAC, and a garage door, OHMY!!!
Wednesday, July 28, 2010
Tuesday, July 27, 2010
the roof, the roof, the roof is on fire!
Actually, no it isnt but we have one! Funny thing though--when we pulled up the workers carefully covered their faces from me and my camera. I'll let you figure the rest out. Anyway, my childhood neighbors (Toots and Fritz) were visiting with us and we took them and my mom to the house. They said it was a whole lotta house. Oh yeah! It looks huge next to the neighbors house. There is a house on my property now, something tangible. I can touch it. I am almost giddy I am so excited to finally see the house up.
Monday, July 26, 2010
2nd floor and waterproofing
Sunday, July 25, 2010
The house has a first floor!
Chris and I were able to walk through our first floor this afternoon. Each room is defined and I am starting to be able to visualize the house! I was giddy like a kid in a candy store. It even had the second floor floor down so they just have to frame the second floor and put on the roof. How incredibly exciting!
Study-not sure why there is a microwave in there...
Dining room
Kitchen into morning room
Family room
Kitchen!
Morning room
garage
Study-not sure why there is a microwave in there...
Dining room
Kitchen into morning room
Family room
Kitchen!
Morning room
garage
Friday, July 23, 2010
Framing has begun!
So, our basement and garage concrete slabs were poured on Wednesday. Of course, my camera had a dead battery. Thursday our framing was started. On Friday afternoon the first floor was there!!!
Our project manager sent his weekly email and said that the framing should be done early/mid year and then the HVAC, plumber, and electrician will all come and do their thing by the end of next week. Our pre-drywall meeting will be in about 1.5 weeks! How exciting is that?!?!
The first steps of framing (July 22, 2010)
The first floor! July 23, 2010
Our project manager sent his weekly email and said that the framing should be done early/mid year and then the HVAC, plumber, and electrician will all come and do their thing by the end of next week. Our pre-drywall meeting will be in about 1.5 weeks! How exciting is that?!?!
The first steps of framing (July 22, 2010)
The first floor! July 23, 2010
Tuesday, July 20, 2010
No concrete! Waiting game...