Friday night we saw the majority of the heating and air ducts in. During Saturday's visit we saw our front and back sliding glass door had been installed, the HVAC close to being finished, and plumbing almost done as well! These two walk throughs were our first visits into the house as well! It was really neat to see the rooms roughed out and I can really see it coming along. Here are some pictures of the inside and outside as of Saturday.
7/30/10
7/31/10 door in and porch started
Study
dining room
family room
HVAC
basement window
upstairs bathtub
Bedroom 4-guest bedroom
Bedroom 1 -Natalie's bedroom
Loft
Bedroom 2